STIR 10

Technical Parameters

– Sanding: From 0-1.0 mm.
– Dry mass density: 1500-1900 kg/m³
– Norm: MKC EN ETAG 004, ETA-11/0340
– Work temperatures: +5°C – +30°C.
– Mixing with water: approximately 4 min., with around 26-28% water/25kg.
– Working time in container: Up to 4 hours after mixing.
– Spending: for panel adhesion 4-5 kg/m²; for covering panels with reinforcing mesh 4-5 kg/m²
– Adhesion (separation) from the layers of concrete: After 28 days 0.3 N/mm²
– Adhesion (separation) from the layers of polystyrene: After 28 days 0.08 N/mm²
– Material color: Grey.
– Packaging: 25 kg.
– Best before: In the original packaging 12 months, in a warehouse without moisture.

SKU: 101/125 Category:
Description
Adhesive for insulating facades

Application

– Used in thermo insulation facade systems.
– Adhesion of insulation panels in facades.
– Leveling of insulation panels and covering those with a reinforcing mesh, thickness of 4 to 8 mm.
– Insulation panels should be of expanded polystyrene (Styrofoam), or from mineral fibers.
– Usage in layers of indoor or outdoor environments.

Reviews (0)

Reviews

There are no reviews yet.

Be the first to review “STIR 10”
Shipping and Delivery

Shipping is our responsibility.

The delivery of the material to the facility you are working on is our responsibility. We offer delivery to the point where you are working, we do the unloading in case it needs to be insulated from the rain, and we insulate the material.

Shipping in small and large quantities.

We make both small and large deliveries depending on several options.

  • In case we connect a route with 2-3 stops, we offer minimal deliveries.
  • In case of a 1-2 day wait, the route is completely completed and we bring the delivery closer.
    For large quantities over long distances:
  • We also ship to distances further than our warehouse, depending on the agreement.
  • We also ship materials outside of Macedonia, depending on the agreement with the client.